Broken road of Rudauli town.
Bhelsar. Under the Jal Jeevan Mission in Rudauli Nagar Palika, the main roads as well as lanes were dug up to lay the pipeline. Due to which the appearance of the city has deteriorated. Earlier, roads worth crores of rupees were dug up saying that they will be repaired. Even after a year, the repair work has not been completed.
Now the CC, interlocking and paved roads of the streets have been dug up and left. Due to lack of repair work, potholes have formed on the roads at many places. Now the ground sinks due to vehicles plying on these roads. Similarly, in Mohalla Ghosiana, a truck loaded with gravel overturned due to its wheel getting stuck. It was a good thing that no one was around the truck. Dozens of people have been injured due to the wheels of two-wheelers getting stuck at many places.
Under the Central Government’s Jal Jeevan Mission, more than 45 kilometers of lanes and roads have been dug up to lay pipelines and install taps in 10,000 houses. After digging the roads, the water corporation laid the water pipelines and it has been a long time since they were laid, but the repair work has not yet started. The repair work of the roads is hanging in balance due to the lack of leakage testing of the pipelines. The Nagar Palika administration is saying that there is no money to repair the roads.
The roads of the streets were also ruined while laying the pipeline. A letter will be sent to the Water Corporation Department to get the roads dug up in the city repaired.
Suresh Kumar Maurya-Executive Officer, Municipality Rudauli